当前位置:常青藤软件吧下载中心地质石油
Datamine.NPV.Scheduler.v4.29.46.0
  • 软件大小:272 MB
  • 推荐星级:
  • 更新时间:2019-03-09 16:51:32
  • 软件类别:国外软件 / 地质石油
  • 软件语言:英文
  • 联系方式:ygqh@21cn.com
  • 官方主页:Home Page
  • QQ、手机:
  • 运行环境:WIN7

软件简介

NPV Scheduler comprises three main modules: the ultimate pit shell optimizer, the pushback generator, the optimizing scheduler and with NPV Scheduler+, stockpiling and haulage optimization are also included. NPV Scheduler+MFO combines cut-off grade optimization seamlessly within the same framework.

The user is guided through the operation of each module with a flow sheet style menu which gives a clear indication of the processing path and the options available at each step. These options include improved 2D and 3D charting, contouring and visualization tools allowing the user to quickly validate and present the results of an optimization. NPV Scheduler is also supplied with the Data Source Drivers for easy import and export of block models from Datamine, Vulcan, Medsystem, Surpac, Micromine and generic text and SQL database files.

The ultimate pit optimizer is based on the industry standard Lerchs-Grossman method and features treatment of multiple ore types, multiple processing methods and multiple grades or products. Interactive tools are provided for creating slope region boundaries and surfaces, and definition of pit limit polygons. The user can specify a discount rate and mine production rate to generate a block extraction sequence which delivers the optimal net present value to the project. Each block in the output model is individually numbered to show the theoretically best mining sequence. In a single optimization run, any number of pit phases can be generated using a value reduction factor. The pit phases provide a family of nested pits which indicate the sensitivity of the ultimate pit to cost-price variations. The sequence and phase numbers stored in the output model provide an excellent guide to any first pass manual design of interim pits. The ultimate pit shell optimiser and block sequencing components of NPV Scheduler are also available in a separate program, MaxiPit.

Although NPV Scheduler includes ultimate pit and pushback generation, these modules can be by-passed allowing users to import their own pit shells and interim pit designs for scheduling. Wireframe or DTM models from most mine design and CAD programs are supported. 
 

下载地址

下载说明

* 请一定升级到最新版WinRAR3.20才能正常解压本站提供的软件!
* 如果您发现下载链接错误,请点击报告错误谢谢!
* 站内提供的所有软件包含破解及注册码均是由网上搜集,若侵犯了你的版权利益,敬请来信通知我们!
关于本站 | 网站帮助 | 广告合作 | 下载声明 | 友情连接 | 网站地图
cqt8.com 版权所有 冀ICP备09015712号